Vertical board-and-batten nailing to studs in Kanata?
Vertical board-and-batten nailing to studs in Kanata?
Board-and-batten is vertical lumber siding, and the 2024 Ontario Building Code (Div. B, 9.27.6.) sets the rules for it directly. The Code (9.27.5.1.) says cladding is fastened to framing, furring or blocking.
For the lumber itself, the Code (9.27.6.) requires vertical lumber siding to be at least 14.3 mm thick and no more than 286 mm wide. Battens must overlap the boards by at least 12 mm (9.27.6.3.). Nails are corrosion-resistant (9.27.5.5.), at least 51 mm long for lumber siding, spaced no more than 600 mm apart (Table 9.27.5.4.-A), and must penetrate at least 25 mm into framing (9.27.5.7.).
Because board-and-batten is vertical lumber, the Code (9.27.5.1.) also permits fastening to sheathing alone, but only if the sheathing is at least 14.3 mm lumber, 12.5 mm plywood or 12.5 mm OSB. If the sheathing is thinner or a different product, the boards go to studs.
Behind the siding, the Code (9.27.2.2.(4)) requires two planes of protection: the cladding as the first plane, and a drainage plane as the second. That second plane needs a sheathing membrane conforming to CAN/CGSB-51.32-M (9.27.3.2.), lapped at least 100 mm at joints, with upper sheets over lower sheets (9.27.3.3.). The Code's explanatory notes (Appendix A-9.27.3.1.) say a drained space at least 10 mm deep behind the cladding is recommended for walls other than masonry; that is a recommendation in the notes, not a Code requirement.
Flashing is required at every horizontal junction between cladding elements and at every horizontal offset (9.27.3.7., 9.27.3.8.). Over wall openings, flashing is required where the vertical distance from the bottom of the eave to the top of the trim is more than one-quarter of the eave's horizontal overhang. Sealant goes between the siding and any adjacent window or door frames (9.27.4.).
The Code (9.27.2.4.) sets a minimum 200 mm clearance between finished ground and cladding adversely affected by moisture, and names untreated wood as an example. Untreated lumber siding falls in that category, so its bottom edge needs at least 200 mm above finished ground. There is also a minimum 50 mm clearance from any roof surface.
A fair quote for this job should spell out the wall area, the lumber species and thickness, removal of any existing siding and disposal, the sheathing membrane, flashing at all horizontal transitions and openings, trim at corners and around windows and doors, and what happens if damage is found in the sheathing or framing once the old cladding comes off. Ask whether the crew's Working at Heights training is current (an employer duty under O. Reg. 297/13), and ask for a WSIB clearance, which is valid for up to 90 calendar days.
Before signing, ask the contractor what species and grade of lumber they are quoting. Local siding contractors in the Ottawa Construction Network directory can receive your project details through the request form on this page.
Related service: Cedar and Board-and-Batten What it costs: Cedar and board-and-batten
Want this done at your place?
Tell us about your siding and we'll send it to local Ottawa siding contractors, who reply by email. We send it out to local contractors for you. Free, no pressure.
Siding IQ -- Built from the Ontario Building Code, Ontario regulations and City of Ottawa sources and real construction experience. Answers are for informational purposes only and are not a professional assessment.
Ready to Get Quotes?
Find local siding contractors in Ottawa. Free matching, no obligation.