What happens around outlets and vents during a re-side in Vanier?
What happens around outlets and vents during a re-side in Vanier?
Outlets, vents, pipes and light fixtures are wall penetrations, and the 2024 Ontario Building Code (Div. B, 9.27.2.2.(4)) requires that both planes of protection, the cladding itself and the drainage plane behind it, be maintained at every one of them.
Here is what the Code asks for at each penetration. The second plane, the sheathing membrane and flashing, has to be carried around each opening too. Flashing is required at horizontal junctions and offsets in the cladding (9.27.3.8.); ask how the contractor will flash above each vent hood. Sealant goes between the siding and the trim ring or cover plate of each penetration, using a non-hardening exterior sealant that meets ASTM C834, C920, C1184 or C1311 (Div. B, 9.27.4.).
Moving or extending an electrical box is electrical work, a separate trade; ask who does it if a box has to move.
A few things worth asking about before the job starts:
- What does the quote include for re-flashing each vent and outlet, and is that labour already in the price or added per opening?
- If the old membrane behind the penetrations is torn or missing, what is the plan and what does it cost to replace it?
- Will the dryer vent hood and any other covers be replaced or re-used, and who supplies them?
- Does the quote cover the sealant at every penetration, or is that listed separately?
What it costs: Full re-side
Want this done at your place?
Tell us about your siding and we'll send it to local Ottawa siding contractors, who reply by email. We send it out to local contractors for you. Free, no pressure.
Siding IQ -- Built from the Ontario Building Code, Ontario regulations and City of Ottawa sources and real construction experience. Answers are for informational purposes only and are not a professional assessment.
Ready to Get Quotes?
Find local siding contractors in Ottawa. Free matching, no obligation.